Bhubaneswar, Jan 4: Chi
It has been constructed with pre-fab materials. The pre-fabricated steel and concrete materials have been used in construction of the building and it has been completed within record time of 5 months. The available office space in the building is 5400 sq feet built in G+3 structure.
A total amount of 1 cr and 2 lakhs have been utilized for completing the building with all electric, air conditioner, water connection and sanitation facilities. Experts said that the building is calamity resistant and strong.